Annex 4b - RAI Electrical Regulations for Stand Construction

Connection to the Convention Centre electricity network has been assigned exclusively by RAI to a Preferred Supplier. The use of battery packs is permitted subject to conditions; for further information, please refer to ANNEX 4c 'RAI Regulations for the Use of Batteries and Battery-Powered Equipment'.

1 Additional conditions relating to electrical power

1.1The floors of the halls contain service ducts for all technical connections. These ducts are indicated by dots on the floor plan; stands should preferably be positioned over at least one duct. A power supply line must be requested for each stand. A stand has one stand Exhibitor; if there are several stand Exhibitors, this constitutes a pavilion. In a pavilion, a separate power supply line is required for each stand Exhibitor.
1.2The connection of temporary installations and stands to the Convention Centre electricity network (the supplied voltage is 400 V / 50 Hz between phases and 230 V / 50 Hz between one phase and the neutral conductor) is assigned exclusively to the Supplier designated by RAI, being a certified installer (for information purposes: at the time the RAI Accommodation Regulations were adopted, the Supplier was Mansveld Expotech BV).
As the responsible party, the Supplier is solely responsible for temporary connections and is the only provider of all main connections (distribution groups in the power chain).
1.3Independent power generation, e.g. by means of generators, battery packs or accumulators, is not permitted.
1.4All Electrical Installations, and specifically temporary stand installations, must comply with Dutch laws and regulations and with the generally accepted state of the art, including the latest editions of NEN 8020-20, NEN 1010, NEN 3111, NEN-EN 50110 and NEN 3140.
Irrespective of which installer is engaged, they must be inspected by the Supplier designated by RAI (a certified installer; for information purposes: at the time the RAI Accommodation Regulations were adopted, the Supplier was Mansveld Expotech). If required, this Supplier can also provide the full stand installation.
1.5

For technical reasons, it may be necessary to connect several stands to one switch cabinet, or to place the switch cabinet in a neighbouring stand. If this should unexpectedly be the case, the Exhibitor is not permitted to switch the power supply of a neighbouring stand on and/or off. The principle remains, however, that one main connection is always installed per stand, in order to limit nuisance in the event of faults or similar issues at one of the main connections.
It is solely the Supplier's responsibility to connect third parties by means of a distribution group (an electrical power chain feeding one or more distribution boards). The distribution boards used must:

  • Be suitable for regular assembly and dismantling and appropriate for the use and environment;
  • Be fitted with a four-pole main switch that can de-energise the downstream installation in a single action. Using a plug connection for this purpose is not permitted; and
  • Be installed without being combined; it is not permitted to combine power supply lines between stands.

Multi-socket outlets and cable reels are classified as work equipment. Cable reels must be fully unwound when in use and must not feed another cable reel.
Distribution blocks may be extended with another distribution block only once.
Cable reels must not be supplied via a multi-socket block. All multi-socket outlets and cable reels must have a minimum conductor cross-section of 2.5 mm2 and be suitable for the nominal supply voltages used.

1.6

The Exhibitor must submit to the certified installer, via Exhibitor Services, no later than twenty-eight (28) days before the first build-up day of the Event, the required power capacity and any provisions required, together with a sketch of the stand indicating the stand location and positions of the main connections. A surcharge will be charged for main connections that are not submitted on time.

At the Supplier's request, the certified installer must be able to provide RAI with the following information:

  • Demonstrable RES EU certification. In Dutch known as InstallQ certification (previously known in Dutch as SEI/REI certification);
  • If fitters are employed: a demonstrable appointment policy in accordance with electrical laws and regulations, in line with NEN 3140, NEN 1010 and NEN 8020-20;
  • Electrical engineering diplomas of the electrical fitters; and
  • Inspection certificates for all electrical provisions, distribution cabinets and cabling.
1.7RAI has separate day-current and continuous-current connections to prevent unnecessary power consumption outside exhibition opening hours and to safeguard safety in the RAI building.
Day current (including stand lighting) is switched on from half (0.5) an hour before until half (0.5) an hour after the Event opening hours for consumer Events.
For trade Events, this is from one (1) hour before until one, and up to a maximum of two (1, maximum 2), hours after the opening hours; please check the specific exhibition information.
When using a refrigerator and/or computer and security equipment in stands, it is advisable to request continuous current.
All power supply to the stands will be disconnected immediately at the end of the Event on the final Event day for safety reasons. Please take this into account and ensure equipment is switched off in good time.
1.8

If, in the Supplier's opinion, the Client's installation is defective or otherwise unsound, the Supplier has the right to withhold the power supply from the Client.

 

2 General notes on electrical stand installations

2.1Stand installations must be executed using sheathed cables, with a minimum specification of H05RNF or H07RNF, and with a minimum conductor cross-section of 2.5 mm2 or equivalent. The use of thinner wires for power supply lines to socket outlets is strictly prohibited.
2.2Exceptions apply to power supply lines for lighting; these may be installed using 1.5 mm2 conductors, provided the load does not exceed 2 kW and the final circuits are protected accordingly.
Cables installed beneath floors must have a minimum conductor cross-section of 2.5 mm2 and must consist of one continuous length, without interruption.
2.3The installation must be divided into sufficient circuits and evenly distributed across the phases. Each circuit must be fitted with the appropriate protective devices, and all final circuits must be individually provided with additional protection by means of a residual-current device (DC type) with a maximum tripping current of 30 mA.
2.4For main connections with capacities above 10 kW, you are responsible for ensuring correct load distribution and the provision of residual-current device(s).
Junctions must be made using wire connectors or industrial terminal blocks and must be additionally protected by means of a junction box. Concealing junctions behind walls, beneath floors or in ceilings is not permitted.
2.5Electrical cables must be installed at a sufficient distance from steam, water or gas pipes. Cables exposed to possible damage must be properly protected.
Metal parts that could become live in the event of an electrical fault must be properly earthed. Electrical cables and materials must be adequately secured using the correct industrial fixing materials.
2.6Motors must be fitted with a switch with thermal protection. Motors with a capacity greater than 3 kW must also be fitted with a starting device, whereby the starting current does not exceed three times the rated current, up to a maximum of 180 A.
2.7

The electrical stand installation must be designed in such a way that faults caused by higher harmonics do not affect the electricity network within the RAI building. The following limit values apply:

  • Total harmonic distortion (THD) < 5%
  • Percentage of the 3rd harmonic in relation to the 1st harmonic < 3%; and
  • Power factor (cos phi) > 0.9.

Overview of key points for electrical installations:

Earthing:

  • Freestanding and suspended truss structures must be earthed;
  • Suspended truss structures must be earthed, irrespective of height. A truss is an extraneous conductive part that may become live in the event of a fault and, under statutory regulations, must therefore always be earthed;
  • Aluminium system stands must be earthed;
  • A maximum of four aluminium system stands may be connected per earth connection, depending on the situation this may be five stands;
  • Steel structures must be earthed, as these are regarded as extraneous conductive parts; and
  • Earthing must be carried out by means of a separate conductor marked with yellow/green insulation and with a minimum cross-section of 6 mm2, connected as close as possible to the earthing point of the distribution board or to the available main earthing terminal.

Junctions:

  • A junction may be made using a wire connector, provided it is suitable for the relevant flexible cable; and
  • Junctions, whether within or outside reach, must be protected by means of an IP54 junction box.

Residual-current devices and switches:

  • Residual-current devices must be Class A;
  • Splitters are not permitted;
  • Each final circuit must be fitted with a 30 mA residual-current device or residual-current element;
  • The maximum load per circuit is 3 kW (16 A). If the amperage per circuit exceeds 16 A, it must be distributed across three (3) phases;
  • Heat-emitting lighting must be kept at least 0.1 m away from any combustible material. In addition, reflected radiation within 0.3 m, measured from the edge of the reflector, must not strike any combustible material; and
  • Neon installations must comply with NEN 1010 and NEN-EN 50107 and must be designed so that they can be switched off using one centrally located, easily accessible fire service switch.

Stand installations:

  • Every switch and distribution board must be fitted with a main switch for switching on and off;
  • Inserting or removing a plug > 3 kW is not an acceptable method of switching a switch or distribution board on or off; and
  • The stand installation must be executed using sheathed cable, with a minimum specification of H05RNF or H07RNF.

Cabling:

  • Power supply lines for lighting < 2 kW must have a minimum conductor cross-section of 1.5 mm2, except for factory-fitted/original luminaire cabling with a conductor cross-section of 1 mm2;
  • Cabling beneath raised floors must be installed without interruption;
  • Cabling beneath raised floors must have a minimum conductor cross-section of 3 x 2.5 mm2; depending on the situation, a conductor cross-section of 3 x 1.5 mm2 in combination with a 10 A circuit breaker may be used as an emergency solution;
  • Lighting may be installed using so-called festoon lighting cable, provided it is correctly installed and the lampholders are fitted with intact lamps;
  • The use of flat conductors is not permitted;
  • Secondary lines must be protected against short circuit and overload;
  • Lighting may be installed using so-called festoon lighting cable, provided it is correctly installed and the lampholders are fitted with intact lamps; and
  • Locations where the existing emergency lighting does not provide sufficient coverage require additional emergency lighting in order to guarantee a safe escape route.

Testing and inspections:

  • The interval between two successive NEN 3140 inspections of a switch and distribution board is a maximum of one year. This frequency follows from Annex T (electrical work equipment) of NEN 3140: A1(10) + B2(10) + C2(10) + D2(10) = 40 points;
  • If the frequency of use is low (< 5 times per year), the interval between two successive inspections of a switch and distribution board is a maximum of two years, although for practical reasons this is usually one year;
  • The switch and distribution board must carry a mark or sticker showing who carried out the NEN 3140 inspection and the expiry/validity date. The inspection report and accompanying installation drawings must also be available;
  • The stand installation must be inspected in accordance with NEN 1010-6 before being put into use. The result must be demonstrably recorded in the relevant handover report. If a stand installation is rejected, it will not be energised; power will only be released after a declaration of repair and a re-inspection without deviations;
  • For smaller, uniform stands, the stand installation may be distributed across several stands; the switch and distribution board is decisive;
  • Cabling, distribution blocks and similar items are inspected on a random-sample basis;
  • Power cables, generally > 6 mm2, must be demonstrably inspected; and
  • A stand may only be illuminated by means of electric lighting.

This Annex 4b 'Electrical Regulations for (Stand) Construction'
is attached to the Accommodation Regulations,
was prepared by RAI Real Estate and
was last updated on 1 August 2026.